|
RAID AUSTRALIA 2004 |
Wenlock River
| There were many ways to cross the Wenlock in a 2CV... |
|
|
...most of us on the back of a
truck (Claude Hermans) |
|
...some of us nearly off
the back of a truck |
|
|
|
...some of us needed to be pulled (Tobias Scholz) |
|
...some of us needed just a
little push |
|
|
|
...and some of us tried it our
own way ! |
Now we ALL do it this way... |
|
|
How the bridge was built, have a look here: 07.11.2000 Bridge Construction above Crossing Left Bank. 09.11.2000 Right Bank to Left Bank. New Bridge and Old Crossing |